We build complete fire pump rooms, including duty, standby and jockey pumps, controllers, valves and test connections.
After installation we run performance and automatic-start tests and set up a periodic testing programme that keeps the pumps ready.
Scope of work
- 01Pump selection from hydraulic calculations
- 02Supply and installation of pumps and controllers
- 03Valves, test headers and flow meters
- 04Performance and automatic-start testing
- 05Maintenance and periodic testing
Systems & components
- Electric fire pump
- Diesel fire pump
- Jockey pump
- Pump controllers
- Flow meters and test connections
References & standards
- NFPA 20 — Installation of Stationary Fire Pumps
- NFPA 25 — Inspection, Testing and Maintenance
- Saudi Fire Code SBC 801